Allenvale, Burnside Primary and Cobham Intermediate Schools (ABC)

About the Project

The new Allenvale, Burnside Primary and Cobham Intermediate campus brings the three schools together in one location.

Ministry of Education
Client
October 2023
Completed
Christchurch
Location
Allenvale, Burnside Primary and Cobham Intermediate Schools (ABC)

The new Allenvale, Burnside Primary and Cobham Intermediate campus brings the three schools together in one location. There they benefit from sharing facilities, while continuing to maintain their own separate teaching spaces.

Allenvale, Burnside Primary and Cobham Intermediate Schools (ABC)

The project stretches over 7,700m2 of floor space, with a configuration of 7 new teaching blocks, an administration building and dual-purpose gymnasium that doubles as a hall for assemblies and large gatherings when needed. Extensive hardscape areas of 11,000m2 and associated landscaping were also part of the project’s scope.

Allenvale, Burnside Primary and Cobham Intermediate Schools (ABC)

Together the early works and main works stages consisted of 5 separable portions, which has seen the project’s delivery span over 3 years.

Allenvale, Burnside Primary and Cobham Intermediate Schools (ABC)

Large-scale staged demolition and asbestos removal of 19 buildings and associated hardscaping was required, and it all occurred while the schools were operational.

Related Projects

University of Canterbury UCSA

The 3,500m2, two-storied purpose-built student association building provides facilities including a Performance Theatre, Function Centre, Social Spaces, UCSA office, and external entertainment areas, including an amphitheatre and outdoor kitchen.

Nukumea Primary School

18 teaching spaces over 2 levels, an outdoor learning area, administration facilities, a multipurpose hall, and a library. Landscaping, including car parking and sports fields, round out the project that forms the heart of the community.

University of Otago - Dental School Redevelopment

Key to the project was creating a cohesive language between these buildings, connecting new with old, to ensure an ease of navigation for patients, staff and students alike.

bottom of page