Burwood Hospital Redevelopment Project

About the Project

In 2014, Leighs Cockram Joint Venture commenced work on the Burwood Health Campus, the first major Government project to commence following the 2011 earthquakes.

Included in the 32,000m² project are three, three-storey ward blocks, providing accommodation for up to 230 patients; clinical support services, such as radiology and physiotherapy; and an outpatient clinic catering for about 80,000 people each year.

Canterbury District Health Board
Client
June 2016
Completed
Christchurch
Location
Burwood Hospital Redevelopment Project

The works were undertaken at an existing, busy hospital facility, so great care was taken to ensure the continuity of all services.

This new state-of-the-art facility for Canterbury's elderly is part of the largest and most complex hospital building project in the history of New Zealand's public health service.

Burwood Hospital Redevelopment Project

The back of house area services the increased hospital size and comprises a commercial hospital kitchen, clean and dirty loading bays, supply and distribution space and the plant to support the hospital. The boiler house contains two furnaces that run on wood waste and produce enough hot water and steam for the entire hospital.

Burwood Hospital Redevelopment Project

This project won a Gold Award and was the National Health Category winner at the 2017 NZ Commercial Project Awards.

Burwood Hospital Redevelopment Project

Related Projects

The Gilgit Wing at Allevia Hospital

A major new hospital wing delivering modern inpatient care, improved clinical flow, and future-ready infrastructure, built within a live healthcare campus to support Allevia Hospital’s growing services and community needs.

KM Surgical Centre and Avenue Health

Two operating theatres, pre-op and recovery rooms, six consultant rooms, two treatment rooms, laser procedure room, pathology, Solais suite, phototherapy room, LED room, and a number of staff spaces.

Starship Children’s Hospital, Ward Refurbishment

Working within a 24/7 operational facility, with live wards above and below, the main level 5 works involved high levels of communication, and a key focus on the health and safety of all those involved.

bottom of page