top of page
leighs-yellow.png

ANZ Centre

About the Project

The three-storey plus basement ANZ Centre has been constructed on a high-profile site bordering Colombo, Cashel, and High Streets, in the heart of Christchurch’s CBD.

The ANZ Centre is a sophisticated fusion of retail and offices. It is now home to 500 staff of the ANZ Bank, Beca, and a range of retail outlets, including Glassons, Hallensteins, Macpac, Merchant and Storm.

CHC Properties Ltd
Client
February 2017
Completed
Christchurch
Location
ANZ Centre

As well as the base build, Leighs Construction also completed an architecturally designed fit-out for Beca Engineering, including office space for 300 staff, meeting rooms, reception, and kitchens, along with office and branch fit-outs for ANZ. These fit-outs were carried out whilst the base build was being completed, as were a number of retail fit-outs.

The ground floor provides access to retailers, cafes, upper floor office spaces, and an 82-space basement carpark with bike storage.

ANZ Centre

The building footprint is approximately 3100m², with a total project size of 15,000m². The atrium’s high-end finish has feature white Carrera marble flooring and a stepped and curved fibrous plaster ceiling. The building is designed to withstand a 1 in 2500-year MCE (Main Considered Earthquake). In a 1-in-2500 year event, the building will be damaged beyond repair, but will not collapse. The base isolators used for the project were designed and supplied off-shore, with the units undergoing two separate testing inspection regimes.

ANZ Centre

The outcome of this project showcases Leighs’ ability to produce a high-standard and quality commercial fit out, including a challenging design, from a programme, architectural and services perspective.

ANZ Centre

Related Projects

The Langlands Hotel

A 4.5-Star, 3,000m² hotel is comprised of three main forms, two are five storeys high, with a larger, seven-storey form on the corner of Dee and Don Streets.

Arts Centre F Block – The Observatory Hotel

Leighs steadily and methodically strengthened the existing structure through new foundations, shear walls, diaphragm floors and roof structures, and then reconfigured the internal spaces as a 33-room luxury boutique hotel.

The Hub Hornby

Staged construction works at The Hub Hornby delivered upgraded retail spaces and improved functionality within a busy commercial precinct.

bottom of page