Leighs Construction was contracted to rebuild a new 2,700m2 store and began work in November 2011 with the store open for business on 1 August 2012, a month earlier than planned.

Briscoes was badly damaged in the February 2011 earthquakes and demolished by Mackay Leighs Demolition in June 2011.
Lichfield Holdings
Client
July 2012
Completed
Christchurch
Location
Briscoes Salisbury Street

The building was constructed with a suspended ground floor slab to protect it from any future liquefaction – the cause of so much damage to the original building. The slab sits on 8.5m long driven concrete piles.