top of page
leighs-yellow.png

NZ Post Mail Handling Centre

About the Project

The Christchurch Mail Handling Centre is a facility of national importance and an essential component in New Zealand’s postal infrastructure.

The 30,000m² project was constructed on a greenfields site that forms part of the Christchurch International Airport campus.

New Zealand Post
Client
February 2007
Completed
Christchurch
Location
NZ Post Mail Handling Centre

The 10,000m² building accommodates a range of activities and the equipment required of what is essentially a national distribution centre. The facility is also home to office space, meeting rooms, secure areas, staff amenities, and shared social areas.

NZ Post Mail Handling Centre

NZ Post Mail Handling Centre

NZ Post Mail Handling Centre

Related Projects

Interim Post-Entry Quarantine Facility

Though the buildings appear deceptively simple, “just” twelve 30m² glasshouses and a 110m² headhouse built on a standard slab with a seismic join between the two buildings, it was the first of its kind in New Zealand.

New Zealand Embassy, Dili

The design and construction of the New Zealand Embassy in Timor-Leste’s (East Timor) capital Dili, was a prestigious project awarded to Leighs Construction by the Ministry of Foreign Affairs in January 2008.

The Forge – Te Toki

A modern, flexible industrial facility purpose-built to support advanced defence manufacturing, secure operations, and future growth, delivered with a focus on resilience, efficiency, and high-performing infrastructure.

bottom of page