top of page
leighs-yellow.png

Tongariro Prison

About the Project

Following the successful delivery of Building C at Mt Eden Corrections Facility (MECF), Leighs completed a significant prison development in Tūrangi.

The project involved finishing a new modular prison block that required comprehensive remediation, completion of outstanding works, and full commissioning to Code Compliance standard.

Department of Corrections
Client
2021
Completed
Tūrangi, Waikato
Location
Tongariro Prison

The scope included extensive fitout works to cells, programme spaces, and support facilities, alongside commissioning of all building systems. Working from a partially built structure, Leighs mobilised rapidly to the remote Waikato location, assembling a multi-disciplinary team drawn from both local and Auckland-based specialists.

Tongariro Prison

The remote location required strategic workforce planning. Leighs established site management oversight from our Auckland office, with key supervisory staff regularly travelling to Tongariro to lead the works. We assembled a mixed team of locally-based subcontractors—such as electricians—alongside Auckland-based specialists like painters, all selected based on their proven track record with us at MECF and their security clearance qualifications. This approach ensured we could mobilise quickly while maintaining the trusted relationships and reliability essential for corrections environments.

Tongariro Prison

Taking on completion works required thorough analysis of the existing structure and quality of previously completed works. Leighs undertook comprehensive measuring and QA inspections, including innovative techniques such as drilling inspection holes and inserting cameras to examine concealed building components. This detailed assessment informed our remediation strategy and ensured that all work met the required standard.

Tongariro Prison

Leighs successfully completed the facility to Code Compliance standard, delivering a fully operational secure building within the remote Waikato location.

Related Projects

The Forge – Te Toki

A modern, flexible industrial facility purpose-built to support advanced defence manufacturing, secure operations, and future growth, delivered with a focus on resilience, efficiency, and high-performing infrastructure.

Airways Air Traffic Control Facility

Leighs delivered a fully base-isolated IL4 compound for Airways NZ, housing staff and equipment. Designed to the new US post-event resilience standard, it’s NZ’s most seismically resilient building, ensuring operational continuity.

Interim Post-Entry Quarantine Facility

Though the buildings appear deceptively simple, “just” twelve 30m² glasshouses and a 110m² headhouse built on a standard slab with a seismic join between the two buildings, it was the first of its kind in New Zealand.

bottom of page