Work began in March 2013 on the first stage of this redevelopment project and was part of a three-stage regeneration project by Shopping Centre Investments Ltd.

The Hub Hornby is the only shopping centre to receive Enviro-Mark Gold accreditation for its environmental initiatives, focused on electrical energy, waste and resource minimisation.

Shopping Centre Investments Ltd
Client
December 2016
Completed
Christchurch
Location
The Hub Hornby

The initial work included a 6,000m², two-level structure for Farmers Department Store, including a 40 space, second level car park accessed by a ramp. Next on the programme of works was relocating the road around the mall to provide the space requirement for the new Farmers Department Store and car park building. The final stages of works included demolition and integration of new retail spaces within the operating mall, with a new food court being a key component in these works.

The Hub Hornby

The Hub Hornby

The Hub Hornby

Related Projects

ANZ Centre

Construction and fit-out of the ANZ Centre delivered 15,000m² of retail and office space, including high-end finishes, base isolation, and a multi-level basement in Christchurch CBD.

Arts Centre F Block – The Observatory Hotel

Leighs steadily and methodically strengthened the existing structure through new foundations, shear walls, diaphragm floors and roof structures, and then reconfigured the internal spaces as a 33-room luxury boutique hotel.

The Langlands Hotel

A 4.5-Star, 3,000m² hotel is comprised of three main forms, two are five storeys high, with a larger, seven-storey form on the corner of Dee and Don Streets.