Mainfreight Distribution Warehouse

About the Project

Mainfreight contracted Leighs Construction to undertake this large and logistically complex three-stage project.

The works included demolition, site clearance and ground remediation to enable construction of 30,000m² of storage and freight logistics warehousing, in addition to high quality offices and staff facilities.

Mainfreight New Zealand
Client
April 2015
Completed
Christchurch
Location
Mainfreight Distribution Warehouse

Construction included a new food warehouse, freight terminal, main office building extension, and substantial siteworks, including weighbridge and truck wash facilities. Offices with a full commercial kitchen, ablution block and changing rooms opened alongside the weighbridge and the freight terminal and yards.

Mainfreight Distribution Warehouse

Mainfreight Distribution Warehouse

Mainfreight Distribution Warehouse

Related Projects

University of Canterbury UCSA

The 3,500m², two-storied purpose-built student association building provides facilities including a Performance Theatre, Function Centre, Social Spaces, UCSA office, and external entertainment areas, including an amphitheatre and outdoor kitchen.

Arts Centre F Block – The Observatory Hotel

Leighs steadily and methodically strengthened the existing structure through new foundations, shear walls, diaphragm floors and roof structures, and then reconfigured the internal spaces as a 33-room luxury boutique hotel.

Fisher & Paykel Healthcare, Building 4, Daniell Building

A 53,000m² concrete and steel mixed-use building with 5 laboratories, a manufacturing facility, distribution centre, and two model shops, two cafeterias, and a large open-plan office space with seven light wells to house large trees & water features.

bottom of page