MainPower Offices

About the Project

In June 2014, MainPower relocated its Rangiora headquarters to a purpose-built facility, constructed by Leighs, at Southbrook Business Park.

This followed a three-year period post earthquakes, which saw MainPower operate from temporary accommodation, as it was discovered their previous premise was only 10% of code.

MainPower NZ Ltd
Client
February 2014
Completed
Christchurch
Location
MainPower Offices

Relocating to its new home was a significant milestone for MainPower, its staff and the community.

MainPower Offices

An IL4 rated building, with special, post-disaster functions, the head office for MainPower is designed and built to be robust enough to minimise operational disruption following a disaster. The site itself has 1in-500 year flood protection and an uninterruptible power supply and backup generator for improved control and contact centre capabilities.

MainPower Offices

​

MainPower Offices

​

Related Projects

ANZ Centre

Construction and fit-out of the ANZ Centre delivered 15,000m² of retail and office space, including high-end finishes, base isolation, and a multi-level basement in Christchurch CBD.

Les Mills Carpark

This project comprises a seven-level car park and retail precinct that connects Wellesley Street with Victoria Street, including an upgraded rooftop slab to allow for future gym activities.

The Piano: Centre for Music and The Arts

Detailed strengthening, refurbishment, and interior restoration at The Piano, supporting its role as a cultural hub while respecting its architectural significance.

bottom of page